Title: EasyAnt Incubation Status

Easyant graduated as a subproject of Ant

The EasyAnt project graduated on 2013-03-12

Easyant is a build system based on Apache Ant and Apache Ivy.

  • 2011-03-24 Website is online in Apache Incubator infrastructure

  • 2011-01-31 Project enters incubation.

  • 2013-02-27 Release of Easyant core, plugins and skeletons 0.9-incubating

  • 2013-03-12 Easyant graduates as a subproject of Ant

itemtypereference
Websitewwwhttp://incubator.apache.org/easyant/
Mailing listdeveasyant-dev @ incubator.apache.org
.commitseasyant-commits @ incubator.apache.org
.ppmceasyant-private @ incubator.apache.org
Bug tracking.https://issues.apache.org/jira/browse/EASYANT
Source codeSVNhttps://svn.apache.org/repos/asf/incubator/easyant/
MentorsantelderAnthony Elder
ChampionantoineAntoine Lévy-Lambert
MentorsbodewigStefan Bodewig
CommittershibouNicolas Lalevée
CommitersjbenoisJérôme Benois
CommitersjlboudartJean-Louis Boudart
CommiterskpsiddharthSiddhartha Purkayastha
CommitersxavierXavier Hanin
  • none yet

Project Setup

This is the first phase on incubation, needed to start the project at Apache.

DONE. Item assignment is shown by the Apache id. Completed tasks are shown by the completion date (YYYY-MM-dd).

Identify the project to be incubated

dateitem
2011-07-12Make sure that the requested project name does not already exist and check www.nameprotect.com to be sure that the name is not already trademarked for an existing software product.
N/AIf request from an existing Apache project to adopt an external package, then ask the Apache project for the SVN module and mail address names.
2011-01-04If request from outside Apache to enter an existing Apache project, then post a message to that project for them to decide on acceptance.
N/AIf request from anywhere to become a stand-alone PMC, then assess the fit with the ASF, and create the lists and modules under the incubator address/module names if accepted.

Infrastructure

dateitem
2011-02-01Ask infrastructure to create source repository modules and grant the committers karma.
2011-02-01Ask infrastructure to set up and archive mailing lists.
2011-02-15Ask infrastructure to set up issue tracker (JIRA, Bugzilla).
N/AAsk infrastructure to set up wiki (Confluence, Moin).
2011-02-17Migrate the project to our infrastructure.

Mentor-related responsibility/oversight

dateitem
2010-12-08Identify all the Mentors for the incubation, by asking all that can be Mentors.
2011-02-14Subscribe all Mentors on the pmc and general lists.
2011-02-17Give all Mentors access to the incubator SVN repository. (to be done by the Incubator PMC chair or an Incubator PMC Member wih karma for the authorizations file)
....-..-..Tell Mentors to track progress in the file ‘incubator/projects/{project.name}.html’

Copyright

dateitem
2011-09-25Check and make sure that the papers that transfer rights to the ASF been received. It is only necessary to transfer rights for the package, the core code, and any new code produced by the project.
2011-02-17Check and make sure that the files that have been donated have been updated to reflect the new ASF copyright.

Verify distribution rights

dateitem
N/ACheck and make sure that for all code included with the distribution that is not under the Apache license, we have the right to combine with Apache-licensed code and redistribute.
2011-02-17Check and make sure that all source code distributed by the project is covered by one or more of the following approved licenses: Apache, BSD, Artistic, MIT/X, MIT/W3C, MPL 1.1, or something with essentially the same terms.

Establish a list of active committers

dateitem
2011-02-18Check that all active committers have submitted a contributors agreement. Still waiting for Jason Trump's contributor agreement
2011-01-31Add all active committers in the STATUS file.
2011-02-18Ask root for the creation of committers' accounts on people.apache.org. Waiting for Jason Trump's contributor agreement

Project specific

Add project specific tasks here.

Incubation

These action items have to be checked for during the whole incubation process.

These items are not to be signed as done during incubation, as they may change during incubation. They are to be looked into and described in the status reports and completed in the request for incubation signoff.

Collaborative Development

  • Have all of the active long-term volunteers been identified and acknowledged as committers on the project?
    Yes

  • Are there three or more independent committers? (The legal definition of independent is long and boring, but basically it means that there is no binding relationship between the individuals, such as a shared employer, that is capable of overriding their free will as individuals, directly or indirectly.)
    The team is composed by 6 independent committers.
    Yes

  • Are project decisions being made in public by the committers?
    Yes

  • Are the decision-making guidelines published and agreed to by all of the committers?
    Yes

Licensing awareness

  • Are all licensing, trademark, credit issues being taken care of and acknowleged by all committers?
    Yes

Project Specific

Add project specific tasks here.

Exit

Things to check for before voting the project out.

Organizational acceptance of responsibility for the project

  • If graduating to an existing PMC, has the PMC voted to accept it?
    Yes
  • If graduating to a new PMC, has the board voted to accept it?

Incubator sign-off

  • Has the Incubator decided that the project has accomplished all of the above tasks?
    Yes