Title: EasyAnt Incubation Status
Easyant graduated as a subproject of Ant
The EasyAnt project graduated on 2013-03-12
Easyant is a build system based on Apache Ant and Apache Ivy.
2011-03-24 Website is online in Apache Incubator infrastructure
2011-01-31 Project enters incubation.
2013-02-27 Release of Easyant core, plugins and skeletons 0.9-incubating
2013-03-12 Easyant graduates as a subproject of Ant
item | type | reference |
---|---|---|
Website | www | http://incubator.apache.org/easyant/ |
Mailing list | dev | easyant-dev @ incubator.apache.org |
. | commits | easyant-commits @ incubator.apache.org |
. | ppmc | easyant-private @ incubator.apache.org |
Bug tracking | . | https://issues.apache.org/jira/browse/EASYANT |
Source code | SVN | https://svn.apache.org/repos/asf/incubator/easyant/ |
Mentors | antelder | Anthony Elder |
Champion | antoine | Antoine Lévy-Lambert |
Mentors | bodewig | Stefan Bodewig |
Committers | hibou | Nicolas Lalevée |
Commiters | jbenois | Jérôme Benois |
Commiters | jlboudart | Jean-Louis Boudart |
Commiters | kpsiddharth | Siddhartha Purkayastha |
Commiters | xavier | Xavier Hanin |
This is the first phase on incubation, needed to start the project at Apache.
DONE. Item assignment is shown by the Apache id. Completed tasks are shown by the completion date (YYYY-MM-dd).
date | item |
---|---|
2011-07-12 | Make sure that the requested project name does not already exist and check www.nameprotect.com to be sure that the name is not already trademarked for an existing software product. |
N/A | If request from an existing Apache project to adopt an external package, then ask the Apache project for the SVN module and mail address names. |
2011-01-04 | If request from outside Apache to enter an existing Apache project, then post a message to that project for them to decide on acceptance. |
N/A | If request from anywhere to become a stand-alone PMC, then assess the fit with the ASF, and create the lists and modules under the incubator address/module names if accepted. |
date | item |
---|---|
2011-02-01 | Ask infrastructure to create source repository modules and grant the committers karma. |
2011-02-01 | Ask infrastructure to set up and archive mailing lists. |
2011-02-15 | Ask infrastructure to set up issue tracker (JIRA, Bugzilla). |
N/A | Ask infrastructure to set up wiki (Confluence, Moin). |
2011-02-17 | Migrate the project to our infrastructure. |
date | item |
---|---|
2010-12-08 | Identify all the Mentors for the incubation, by asking all that can be Mentors. |
2011-02-14 | Subscribe all Mentors on the pmc and general lists. |
2011-02-17 | Give all Mentors access to the incubator SVN repository. (to be done by the Incubator PMC chair or an Incubator PMC Member wih karma for the authorizations file) |
....-..-.. | Tell Mentors to track progress in the file ‘incubator/projects/{project.name}.html’ |
date | item |
---|---|
2011-09-25 | Check and make sure that the papers that transfer rights to the ASF been received. It is only necessary to transfer rights for the package, the core code, and any new code produced by the project. |
2011-02-17 | Check and make sure that the files that have been donated have been updated to reflect the new ASF copyright. |
date | item |
---|---|
N/A | Check and make sure that for all code included with the distribution that is not under the Apache license, we have the right to combine with Apache-licensed code and redistribute. |
2011-02-17 | Check and make sure that all source code distributed by the project is covered by one or more of the following approved licenses: Apache, BSD, Artistic, MIT/X, MIT/W3C, MPL 1.1, or something with essentially the same terms. |
date | item |
---|---|
2011-02-18 | Check that all active committers have submitted a contributors agreement. Still waiting for Jason Trump's contributor agreement |
2011-01-31 | Add all active committers in the STATUS file. |
2011-02-18 | Ask root for the creation of committers' accounts on people.apache.org. Waiting for Jason Trump's contributor agreement |
Add project specific tasks here.
These action items have to be checked for during the whole incubation process.
These items are not to be signed as done during incubation, as they may change during incubation. They are to be looked into and described in the status reports and completed in the request for incubation signoff.
Have all of the active long-term volunteers been identified and acknowledged as committers on the project?
Yes
Are there three or more independent committers? (The legal definition of independent is long and boring, but basically it means that there is no binding relationship between the individuals, such as a shared employer, that is capable of overriding their free will as individuals, directly or indirectly.)
The team is composed by 6 independent committers.
Yes
Are project decisions being made in public by the committers?
Yes
Are the decision-making guidelines published and agreed to by all of the committers?
Yes
Add project specific tasks here.
Things to check for before voting the project out.