  • 2014-07-16. ASF Board establishes the Apache Tez project.

  • 2014-07-14. Apache Tez 0.4.1-incubating released.

  • 2014-04-05. Apache Tez 0.4.0-incubating released.

  • 2014-02-28. Apache Tez 0.3.0-incubating released.

  • 2013-12-03. Apache Tez 0.2.0-incubating released.

  • 2013-02-25. Apache Tez enters incubation.

  • link to the main website

  • link to the page(s) that tell how to participate (Website,Mailing lists,Bug tracking,Source code)

  • link to the project status file (Committers,non-incubation action items,project resources, etc)

If the project website and code repository are not yet setup, use the following table:

itemtypereference
Websitewwwhttp://tez.incubator.apache.org/
.wikihttps://cwiki.apache.org/confluence/display/TEZ
Mailing listdevdev @ tez.incubator.apache.org
.useruser @ tez.incubator.apache.org
.commitscommits @ tez.incubator.apache.org
Bug tracking.https://issues.apache.org/jira/browse/TEZ
Source codeGIThttps://gitbox.apache.org/repos/asf/incubator-tez.git
MentorsacmurthyArun C. Murthy
.cdouglasChris Douglas
.gatesAlan Gates
.jghomanJakob Homan
.mattmannChris Mattmann
.omalleyOwen O’Malley
CommittersacmurthyArun C. Murthy
.billgrahamBill Graham
.bikasBikas Saha
.bobbyRobert Evans
.cdouglasChris Douglas
.darynDaryn Sharp
.ddasDevaraj Das
.gatesAlan Gates
.gopalvGopal Vijayaraghavan
.guntherGunther Hagleitner
.hiteshHitesh Shah
.hashutoshAshutosh Chauhan
.Jean Xu
.jitendraJitendra Pandey
.jloweJason Lowe
.julienJulien Le Dem
.kevinwilfongKevin Wilfong
.mliddellMike Liddell
.kamrulMohammad Kamrul Islam
.namitNamit Jain
.nrobertsNathan Roberts
.omalleyOwen O’Malley
.rbalamohanRajesh Balamohan
.rohiniRohini Palaniswamy
.ssethSiddharth Seth
.tassapolaTassapol Athiapinya
.tgravesThomas Graves
.tomwhiteTom White
.vikramVikram Dixit
.vinodkvVinod Kumar Vavilapalli

Project Setup

This is the first phase on incubation, needed to start the project at Apache.

Item assignment is shown by the Apache id. Completed tasks are shown by the completion date (YYYY-MM-dd).

Identify the project to be incubated

dateitem
2013-02-25Make sure that the requested project name does not already exist and check www.nameprotect.com to be sure that the name is not already trademarked for an existing software product.
N/AIf request from an existing Apache project to adopt an external package, then ask the Apache project for the SVN module and mail address names.
N/AIf request from outside Apache to enter an existing Apache project, then post a message to that project for them to decide on acceptance.
N/AIf request from anywhere to become a stand-alone PMC, then assess the fit with the ASF, and create the lists and modules under the incubator address/module names if accepted.

Infrastructure

dateitem
2013-03-15Ask infrastructure to create source repository modules and grant the committers karma.
2013-03-15Ask infrastructure to set up and archive mailing lists.
2013-03-15Ask infrastructure to set up issue tracker (JIRA, Bugzilla).
2013-03-15Ask infrastructure to set up wiki (Confluence, Moin).
2013-03-15Migrate the project to our infrastructure.

Mentor-related responsibility/oversight

dateitem
2013-02-22Identify all the Mentors for the incubation, by asking all that can be Mentors.
2013-03-20Subscribe all Mentors on the pmc and general lists.
2013-04-11Give all Mentors access to the incubator SVN repository. (to be done by the Incubator PMC chair or an Incubator PMC Member wih karma for the authorizations file)
2013-04-11Tell Mentors to track progress in the file ‘incubator/projects/{project.name}.html’

Copyright

dateitem
2013-03-15Check and make sure that the papers that transfer rights to the ASF been received. It is only necessary to transfer rights for the package, the core code, and any new code produced by the project.
2013-03-15Check and make sure that the files that have been donated have been updated to reflect the new ASF copyright.

Verify distribution rights

dateitem
2013-03-15Check and make sure that for all code included with the distribution that is not under the Apache license, we have the right to combine with Apache-licensed code and redistribute.
2013-03-15Check and make sure that all source code distributed by the project is covered by one or more of the following approved licenses: Apache, BSD, Artistic, MIT/X, MIT/W3C, MPL 1.1, or something with essentially the same terms.

Establish a list of active committers

dateitem
2014-07-01Check that all active committers have submitted a contributors agreement.
2013-03-15Add all active committers in the STATUS file.
2013-03-15Ask root for the creation of committers' accounts on people.apache.org.

Project specific

Add project specific tasks here.

Incubation

These action items have to be checked for during the whole incubation process.

These items are not to be signed as done during incubation, as they may change during incubation. They are to be looked into and described in the status reports and completed in the request for incubation signoff.

Collaborative Development

  • Have all of the active long-term volunteers been identified and acknowledged as committers on the project?

  • Are there three or more independent committers? (The legal definition of independent is long and boring, but basically it means that there is no binding relationship between the individuals, such as a shared employer, that is capable of overriding their free will as individuals, directly or indirectly.)

  • Are project decisions being made in public by the committers?

  • Are the decision-making guidelines published and agreed to by all of the committers?

Licensing awareness

  • Are all licensing, trademark, credit issues being taken care of and acknowleged by all committers?

Project Specific

Add project specific tasks here.

Exit

Things to check for before voting the project out.

Organizational acceptance of responsibility for the project

  • Podling PMC has voted to accept responsibility of the project as a TLP

  • Board voted to accept Tez as a TLP in its meeting on July 16, 2014

Incubator sign-off

  • Incubator has recommended graduation and voted to approve graduation