Title: SINGA Incubation Status

This page tracks the project status during incubation. For more details, please visit the project website.

The SINGA project graduated on 2019-10-16

SINGA is a distributed, scalable platform for deep learning.

  • 2015-03-17 Project enters incubation.

  • link to the main website

  • link to the page(s) that tell how to participate (Website,Mailing lists,Bug tracking,Source code)

  • link to the project status file (Committers,non-incubation action items,project resources, etc)

If the project website and code repository are not yet setup, use the following table:

itemtypereference
Websitewwwhttp://singa.incubator.apache.org/
.wiki.
Mailing listdevdev @ singa.incubator.apache.org
.commitscommits @ singa.incubator.apache.org
Bug tracking.https://issues.apache.org/jira/browse/singa
Source codeGithttps://github.com/apache/incubator-singa
MentorsgatesAlan Gates
.tdunningTed Dunning
.thejasThejas Nair
CommitterswangweiWang Wei
.dinhttaAnh Dinh
.wangshWang Sheng
.jinyangJinyang Gao
.kaipingZheng Kaiping
.zhaojingLuo Zhaojing
.zhongleXie Zhongle
.ooibcOoi Beng Chin
.tanklTan Kian-Lee
.cgChen Gang
.moazMoaz Reyad

Project Setup

This is the first phase on incubation, needed to start the project at Apache.

Item assignment is shown by the Apache id. Completed tasks are shown by the completion date (YYYY-MM-dd).

Identify the project to be incubated

dateitem
2015-04-03Make sure that the requested project name does not already exist. Please follow the guide to ensure a suitable project/product name.

Infrastructure

dateitem
2015-03-31Ask infrastructure to create source repository modules and grant the committers karma.
2015-03-31Ask infrastructure to set up and archive mailing lists.
2015-03-31Ask infrastructure to set up issue tracker (JIRA, Bugzilla).

Mentor-related responsibility/oversight

dateitem
2015-03-31Subscribe all Mentors on the pmc and general lists.
2015-04-18Tell Mentors to track progress in the file ‘incubator/projects/{project.name}.html’

Copyright

dateitem
2015-03-31Check and make sure that the papers that transfer rights to the ASF been received. It is only necessary to transfer rights for the package, the core code, and any new code produced by the project.

Verify distribution rights

dateitem
2015-03-01.Check and make sure that for all code included with the distribution that is not under the Apache license, we have the right to combine with Apache-licensed code and redistribute.
2015-03-01Check and make sure that all source code distributed by the project is covered by one or more of the following approved licenses: Apache, BSD, Artistic, MIT/X, MIT/W3C, MPL 1.1, or something with essentially the same terms.

Establish a list of active committers

dateitem
2015-04-03Check that all active committers have submitted a contributors agreement.
2015-04-17Add all active committers in the STATUS file.
2015-04-07Ask root for the creation of committers' accounts on people.apache.org.

Project specific

Add project specific tasks here.

Incubation

These action items have to be checked for during the whole incubation process.

These items are not to be signed as done during incubation, as they may change during incubation. They are to be looked into and described in the status reports and completed in the request for incubation signoff.

Collaborative Development

  • Have all of the active long-term volunteers been identified and acknowledged as committers on the project?

  • Are there three or more independent committers? (The legal definition of independent is long and boring, but basically it means that there is no binding relationship between the individuals, such as a shared employer, that is capable of overriding their free will as individuals, directly or indirectly.)

  • Are project decisions being made in public by the committers?

  • Are the decision-making guidelines published and agreed to by all of the committers?

Licensing awareness

  • Are all licensing, trademark, credit issues being taken care of and acknowleged by all committers?

Project Specific

Add project specific tasks here.

Exit

Things to check for before voting the project out.

Organizational acceptance of responsibility for the project

  • If graduating to an existing PMC, has the PMC voted to accept it?

  • If graduating to a new PMC, has the board voted to accept it?

Incubator sign-off

  • Has the Incubator decided that the project has accomplished all of the above tasks?