Title: Apache ServiceComb Project Incubation Status

This page tracks the project status, incubator-wise. For more general project status, look on the project website.

The ServiceComb project graduated on 2018-10-17

ServiceComb is a microservice framework that provides a set of tools and components to make development and deployment of cloud applications easier.

  • 2017-11-22 Project enters incubation.

  • 2017-03-26 ServiceComb Service Center 1.0.0-m1 is released.

  • 2017-03-26 ServiceComb Saga 0.1.0 is released.

  • 2017-04-02 ServiceComb Java Chassis 1.0.0-m1 is released.

  • 2018-06-08 New committer: Zheng yangyong

  • 2018-06-11 New committer: Li Dagang(Eric)

  • 2017-06-22 ServiceComb Service Center 1.0.0-m2 released

  • 2017-06-22 ServiceComb Java Chassis 1.0.0-m2 released

  • 2017-06-22 ServiceComb Saga 0.2.0 released

  • 2018-07-15 New committer: Feng Zheng

  • 2018-08-03 ServiceComb Service Center 1.0.0-m1 released

  • 2018-08-03 ServiceComb Java Chassis released

  • 2018-09-10 All Committer are part of PPMC

  • ServiceComb Website

  • Community Pages

  • Current Users guide Documentation

  • Releases

  • Wiki

  • link to the project status file (Committers,non-incubation action items,project resources, etc)

If the project website and code repository are not yet setup, use the following table:

itemtypereference
Websitewwwhttp://servicecomb.incubator.apache.org/
.wikiWiki
Mailing listissuesissues @ servicecomb.incubator.apache.org
.devdev @ servicecomb.incubator.apache.org
.commitscommits @ servicecomb.incubator.apache.org
Bug tracking.https://issues.apache.org/jira/browse/SCB
Source code..
.incubator-servicecomb-java-chassishttps://github.com/apache/incubator-servicecomb-java-chassis.git
.incubator-servicecomb-service-centerhttps://github.com/apache/incubator-servicecomb-service-center.git
.incubator-servicecomb-sagahttps://github.com/apache/incubator-servicecomb-saga.git
.incubator-servicecomb-docshttps://github.com/apache/incubator-servicecomb-docs.git
.incubator-servicecomb-websitehttps://github.com/apache/incubator-servicecomb-website.git
RosterWhimsyServiceComb Roster
Mentors.
.rvsRoman Shaposhnik
.jbonofreJean-Baptiste Onofre
.tnachenTimothy Chen
Committers.
.ningjiangNing(Willem) Jiang
.zhangqiQiZhang
.seanyinXiang Yin
.wujiminJiMin Wu
.liubaoBao Liu
.asifMohammad Asif Siddiqui
.cuiyihuaYihua Cui
.sukeshSukesh A C
.ericleeEric Lee
.zhengyangyongYangyong Zheng
.zhfengZheng Feng
Extra..

Project Setup

This is the first phase on incubation, needed to start the project at Apache.

Item assignment is shown by the Apache id. Completed tasks are shown by the completion date (2017-12-22).

Identify the project to be incubated

dateitem
2017-11-22Make sure that the requested project name does not already exist. Please follow the guide to ensure a suitable project/product name.
N/AIf request from an existing Apache project to adopt an external package, then ask the Apache project for the SVN module and mail address names.
....-..-..If request from outside Apache to enter an existing Apache project, then post a message to that project for them to decide on acceptance.
....-..-..If request from anywhere to become a stand-alone PMC, then assess the fit with the ASF, and create the lists and modules under the incubator address/module names if accepted.

Infrastructure

dateitem
2017-11-30Request DNS (first step after creating podling status page)
2017-12-06Request Mailing Lists
2017-12-05Request git repositories
2017-12-05Ask infrastructure to create source repository modules and grant the committers karma (if using SVN)
2017-12-05Ask infrastructure to set up issue tracker ( JIRA , Bugzilla).
2017-12-05Ask infrastructure to set up wiki ( Confluence ).
2017-12-22Migrate the project to our infrastructure.

Mentor-related responsibility/oversight

dateitem
2017-12-06Subscribe all Mentors on the pmc and general lists.
2017-12-06Give all Mentors access to the incubator SVN repository. (to be done by the Incubator PMC chair or an Incubator PMC Member wih karma for the authorizations file)
2017-12-06Tell Mentors to track progress in the file ‘incubator/projects/{project.name}.html’

Copyright

dateitem
2017-12-26Check and make sure that the papers that transfer rights to the ASF been received. It is only necessary to transfer rights for the package, the core code, and any new code produced by the project.
2017-12-26Check and make sure that the files that have been donated have been updated to reflect the new ASF copyright.

Verify distribution rights

dateitem
2018-04-02Check and make sure that for all code included with the distribution that is not under the Apache license, we have the right to combine with Apache-licensed code and redistribute.
2018-04-02Check and make sure that all source code distributed by the project is covered by one or more of the following approved licenses: Apache, BSD, Artistic, MIT/X, MIT/W3C, MPL 1.1, or something with essentially the same terms.

Establish a list of active committers

dateitem
2017-12-11Check that all active committers have submitted a contributors agreement.
2017-12-11Add all active committers in the relevant section above.
2017-12-11Ask root for the creation of committers' accounts in LDAP.

Project specific

Add project specific tasks here.

Incubation

These action items have to be checked for during the whole incubation process.

These items are not to be signed as done during incubation, as they may change during incubation. They are to be looked into and described in the status reports and completed in the request for incubation signoff.

Collaborative Development

  • Have all of the active long-term volunteers been identified and acknowledged as committers on the project?

  • Are there three or more independent committers? (The legal definition of independent is long and boring, but basically it means that there is no binding relationship between the individuals, such as a shared employer, that is capable of overriding their free will as individuals, directly or indirectly.)

  • Are project decisions being made in public by the committers?

  • Are the decision-making guidelines published and agreed to by all of the committers?

Licensing awareness

  • Are all licensing, trademark, credit issues being taken care of and acknowleged by all committers?

Project Specific

Add project specific tasks here.

Exit

Things to check for before voting the project out.

Organizational acceptance of responsibility for the project

  • If graduating to an existing PMC, has the PMC voted to accept it?

  • Yes

  • If graduating to a new PMC, has the board voted to accept it?

  • Yes

Incubator sign-off

  • Has the Incubator decided that the project has accomplished all of the above tasks?

  • Yes