Title: Drill Podling Status Page

This page tracks the project status, incubator-wise. For more general project status, look on the project website.

The Drill project graduated on 2014-11-19

Drill is a distributed system for interactive analysis of large-scale datasets, inspired by Google's Dremel.

  • 2012-09-11 Project enters incubation.
itemtypereference
Websitewwwhttp://incubator.apache.org/drill/
Mailing listsdeveloperdrill-dev @ incubator.apache.org
private (PPMC)drill-private @ incubator.apache.org
userdrill-user @ incubator.apache.org
Bug trackinghttps://issues.apache.org/jira/browse/DRILL
Source codeSVNWeb site: http://svn.apache.org/repos/asf/incubator/drill
Source code: https://gitbox.apache.org/repos/asf/incubator-drill.git
ChampionTed Dunning See the Drill team page
MentorsFIXME: See the Drill team page
CommittersFIXME: See the Drill team page

Project Setup

This is the first phase on incubation, needed to start the project at Apache.

Item assignment is shown by the Apache id. Completed tasks are shown by the completion date (YYYY-MM-dd).

Identify the project to be incubated

dateitem
November 1, 2012Make sure that the requested project name does not already exist and check www.nameprotect.com to be sure that the name is not already trademarked for an existing software product.
2012-09-01If request from anywhere to become a stand-alone PMC, then assess the fit with the ASF, and create the lists and modules under the incubator address/module names if accepted.

Interim responsibility

dateitem
2012-08-09Identify all the Mentors for the incubation, by asking all that can be Mentors.
2012-08-09Subscribe all Mentors on the pmc and general lists.
2012-08-20Give all Mentors access to the incubator SVN repository. (to be done by the Incubator PMC chair or an Incubator PMC Member wih karma for the authorizations file)
2012-08-30Tell Mentors to track progress in the file ‘incubator/projects/{project.name}.html’

Copyright

dateitem
2012-08-25Check and make sure that the papers that transfer rights to the ASF been received. It is only necessary to transfer rights for the package, the core code, and any new code produced by the project.
2012-08-25The Apache RAT check was added to check and make sure that the files that have been donated have been updated to reflect the new ASF copyright.

Verify distribution rights

dateitem
N/ACheck and make sure that for all code included with the distribution that is not under the Apache license, e have the right to combine with Apache-licensed code and redistribute.
N/ACheck and make sure that all source code distributed by the project is covered by one or more of the following approved licenses: Apache, BSD, Artistic, MIT/X, MIT/W3C, MPL 1.1, or something with essentially the same terms.

Establish a list of active committers

dateitem
2012-08-15Check that all active committers have submitted a contributors agreement.
2012-08-20Add all active committers in the STATUS file.
2012-08-20Ask root for the creation of committers' accounts on people.apache.org.

Infrastructure

dateitem
2012-09-02Ask infrastructure to create source repository modules and grant the committers karma.
2012-08-20Ask infrastructure to set up and archive Mailing lists.
2012-08-20Decide about and then ask infrastructure to setup an issuetracking system (Bugzilla, Scarab, Jira).
2012-08-20Migrate the project to our infrastructure.

Incubation

These action items have to be checked for during the whole incubation process.

These items are not to be signed as done during incubation, as they may change during incubation. They are to be looked into and described in the status reports and completed in the request for incubation signoff.

Collaborative Development

  • Have all of the active long-term volunteers been identified and acknowledged as committers on the project?

  • Are there three or more independent committers? (The legal definition of independent is long and boring, but basically it means that there is no binding relationship between the individuals, such as a shared employer, that is capable of overriding their free will as individuals, directly or indirectly.) YES

  • Are project decisions being made in public by the committers? YES

  • Are the decision-making guidelines published and agreed to by all of the committers?

Licensing awareness

  • Are all licensing, trademark, credit issues being taken care of and acknowleged by all committers? YES

Project Specific

No project specific tasks here.

Exit

Things to check for before voting the project out.

Organizational acceptance of responsibility for the project

  • If graduating to an existing PMC, has the PMC voted to accept it?

  • If graduating to a new PMC, has the board voted to accept it?

Incubator sign-off

  • Has the Incubator decided that the project has accomplished all of the above tasks?