| title: "How to Organize DevLake Projects" |
| sidebar_position: 1 |
| description: > |
| How to Organize DevLake Projects |
| --- |
| |
| ## 1. Introduction |
| This guide provides step-by-step instructions for organizing projects in DevLake. |
| It is intended for team leads and developers who want to optimize their workflow. |
| Herein, we will explore various use cases to demonstrate the practical application of these instructions. |
| |
| Development teams typically manage `pull requests`, `deployments`, and `incidents` using various boards. |
| |
| Based on such, we want to measure their productivity and stability. This is how [DORA](../DORA.md) does that: |
| - Productivity: |
| - How many times does the team `deploy`? (a.k.a. [Deployment Frequency](../Metrics/DeploymentFrequency.md)) |
| - How fast are the `pull requests` resolved? (a.k.a. [Lead Time](../Metrics/LeadTimeForChanges.md)) |
| - Stability: |
| - How many `incidents` per `deploys` does the team have? (a.k.a. [Change Failure Rate](../Metrics/CFR.md)) |
| - How fast are these `incidents` solved? (a.k.a. [Median Time to Restore](../Metrics/MTTR.md)) |
| |
| All these questions/metrics are based on either `pull requests`, `deployments`, or `incidents`. |
| |
| Note: _All three are completely separate entities and are associated only with their project._ |
| |
| #### General advice |
| |
| There are 3 red lines when it comes to structuring your DevLake `projects`: |
| |
| But when we scale this up, a few problems arise: |
| - A team usually works with multiple `repos` |
| - A team also might work on different projects, and we want to measure these projects separately (e.g. it is not the same to work on a big old legacy as on a greenfield) |
| - There may be multiple teams |
| - A `board` contains incidents of multiple teams or projects |
| - A `repository` is managed by multiple teams or projects, e.g. a monorepo |
| - A `pipeline` can trigger deployments in multiple repos |
| - Some organizations want to measure DORA based on projects, and some want to measure it by teams |
| |
| This is where the `project` concept comes into play. |
| |
| ## 2. What is a DevLake project? |
| In practical terms, a project usually involves building or researching solutions to address specific problems |
| or explore new opportunities. A DevLake project is a grouping of `pull requests`, `deployments`, or `incidents`. |
| It can be seen as a real-world project or product line. DevLake measures DORA metrics for each project. |
| |
|  |
| |
| Note: _It does not matter if a team works on a particular repository more than another. |
| The metrics are calculated over the entire set of repos, and the values are accumulated. |
| More on that: [Debugging DORA Issue Metrics](../Troubleshooting/Dashboard.md#debugging-dora-issue-metrics)._ |
| |
| ## 3. As a team lead, how many DevLake projects do I need? |
| |
| DevLake's flexible structure enables you to organize `pull requests`, `deployments`, and `incidents` |
| in a manner tailored to your specific projects, teams, or technologies. |
| |
| The examples below show the patterns of how to organize your projects. |
| To keep things simple we assume that we work with **GitHub** repos, **Jira** boards, |
| and **Jenkins CI/CD** deploys in each GitHub repo. |
| |
| The same would apply to other repos (e.g. GitLab or BitBucket), boards (e.g. TAPD), |
| or CI/CD (e.g. GitLab CI, Azure DevOps). |
| |
| ## 4. Use Cases |
| This section demonstrates real-life situations and how they get reflected in DevLake. |
| |
| Disclaimer: _To keep this guide shorter, some technical details are only mentioned in |
| [Use Case 1](HowToOrganizeDevlakeProjects.md#41-use-case-1-apache-projects), |
| so if you read this page for the first time, make sure to go through them in order._ |
| |
| Note: _If you use webhooks, check the [quick note](HowToOrganizeDevlakeProjects.md#5-about-webhooks) about them below._ |
| |
| ### 4.1. Use Case 1: Apache Projects |
| Apache Software Foundation (ASF) has and is developing many |
| [projects](https://en.wikipedia.org/wiki/List_of_Apache_Software_Foundation_projects). |
| |
| To take an example we will analyze 2 `projects`: DevLake and [Spark](https://spark.apache.org/). |
| Both are independent of each other. Assume that ASF wants to check the health of the development |
| and maintenance of these projects with DORA. |
| |
| DevLake manages 3 `repos`: [incubator-devlake](https://github.com/apache/incubator-devlake), |
| [incubator-devlake-website](https://github.com/apache/incubator-devlake-website), |
| and [incubator-devlake-helm-chart](https://github.com/apache/incubator-devlake-helm-chart). |
| There are many repos related to _Spark_ in one way or another. To keep it simple, |
| we will also pick 3 `repos`: [spark](https://github.com/apache/spark), |
| [spark-website](https://github.com/apache/spark-website), and [incubator-livy](https://github.com/apache/incubator-livy). |
| |
|  |
| |
| Both projects use GitHub for storing code (including `pull requests`), `deployments` on GitHub Actions, and `incidents`. |
| |
| Note: _To avoid confusion between DevLake as a `project` in this use case and DevLake as a platform, |
| we will use complete names i.e. `project DevLake` and `platform DevLake` respectively._ |
| |
| #### 4.1.1. Organizing Projects |
| First, create two projects on the DevLake platform, one for DevLake and one for Spark. |
| These will represent real-world projects. |
| |
|  |
|  |
| |
| Once these are created, the connections created in the following steps will be bound to them. |
| |
| #### 4.1.2. Creating Connections |
| |
| Since all is on GitHub in this case, we can use just 1 connection with the following properties: |
| - it includes all the project's `repos` |
| - its scope includes everything we work with (i.e. `pull requests`, `deployments`, and `incidents`) |
| |
| If you store `incidents` on Jira, for example, you will need to create a separate connection just for them. |
| The same applies to `deployments`, a separate connection is needed in case they are stored in Jenkins (or any other host for `deployments`). |
| |
| #### 4.1.3. Configuring Connections |
| This part is described in [GitHub](/docs/Configuration/GitHub.md) connection configuration. |
| For other platforms check the [Configuration Guide](/docs/Configuration) |
| |
| #### 4.1.4. Using connections |
| |
| At this point, we have projects and connections created on the platform DevLake. |
| It is time to bind those connections to the projects. To do so, follow the steps |
| described in the [Tutorial](/docs/Configuration/Tutorial.md). |
| |
| #### 4.1.5. Resulting Metrics |
| |
| To know if the data of a project is successfully collected go to your DORA Dashboard: |
| |
|  |
|  |
| |
| If everything goes well, you should see all the 4 charts. |
| If something is wrong, and you are puzzled as to why, check out the |
| [Debugging Dora Issue Metrics](../Troubleshooting/Dashboard.md#debugging-dora-issue-metrics) page. |
| |
| #### 4.1.6. How can I observe metrics by project? |
| In the same DORA dashboard check out this menu point: |
|  |
| |
| The metrics should change when you select or deselect projects, representing the projects you selected. |
| |
| ### 4.2. Use Case 2: Multiple Teams with Distinct Projects |
| |
| Consider a scenario where a company operates with several teams, each managing one or more projects. |
| For illustration, we will explore two such teams: the Payments team and the Internal Tools team. |
| Here's a simplified representation of this scenario: |
| |
| #### Quick Overview: |
| - The Payments team works on a single project: “payments”. |
| - The Internal Tools team manages two projects: “it-legacy” and “it-new”. |
| - Both teams use different sets of tools and boards. |
| |
|  |
| |
| #### Step-by-Step Simplification: |
| 1. **Define the Teams and Projects:** |
| - **Payments Team**: |
| - One project: "payments". |
| - **Internal Tools Team**: |
| - Two projects: "it-legacy" and "it-new". |
| 2. **Understand the Tools**: |
| - Assume both teams utilize GitHub for `repos` and Jenkins for CI/CD. |
| - The _Payments_ team uses Jira boards. |
| - The _Internal Tools_ team uses webhooks for reporting incidents. |
| |
| #### 4.2.1. Organizing Projects |
| |
| DORA is effective for observing the impacts of methodology changes within a team. |
| From DORA’s standpoint, the concept of distinct `teams` is not recognized; only `projects` exist. |
| Adding a `team` concept introduces unnecessary complexity without providing any substantial benefit. |
| |
| In DevLake, we create three `projects`: _payments_, _it-legacy_, and _it-new_. |
| |
| It is crucial to maintain **atomic** `projects`, representing the smallest, independent units, |
| to prevent complexity and ensure precise data representation. **Atomic** `projects` allow for a more flexible |
| and accurate data comparison and combination between `projects`. |
| |
| #### 4.2.2. Adding Connections |
| |
| Create just one connection and reuse it across projects by adding data scopes. |
| This method optimizes data collection, minimizing redundancy and ensuring more efficient use of resources. |
| |
| It is NOT recommended to create multiple connections, for instance, GitHub repos, as it |
| will increase the time to collect the data due to the storage of multiple copies of shared repos in the database. |
| |
| The only exception is the webhooks: **we must have 1 connection per project**, |
| as this is the only way DevLake can accurately assign `incidents` to the corresponding `project`. |
| |
| So, in total we will have only these connections: |
| - 1 connection for all GitHub `repos` to collect `pull requests` |
| - 1 connection to Jenkins to collect all `deployments` |
| - 1 connection to Jira to collect `incidents` |
| - 2 webhook connections to collect `incidents`: 1 per each `project` that uses webhooks (_it-legacy_ and _it-new_) |
| |
| The step-by-step [Configuration Guide](/docs/Configuration) shows how to both add connections |
| and set scopes as described in the next chapter. |
| |
| #### 4.2.3. Setting Scopes |
| Now, add the connections to our projects and set the scope to them: |
| |
| For payments `project`: |
| - add 1 scope to GitHub connection for _p1...p10_ `repos` to collect their `pull requests` |
| - add 1 scope to Jenkins for `deployments` of _p1...p10_ `repos` |
| - add 1 scope to Jira to collect `incidents` |
| |
| For it-legacy `project`: |
| - add 1 scope to GitHub for `repos` _it-legacy-1_, _it-legacy-2_, _it-core-1_ and _it-core-2_ to collect their `pull requests` |
| - add 1 scope to Jenkins for `deployments` of _it-legacy-1_, _it-legacy-2_, _it-core-1_ and _it-core-2_ `repos` |
| - include the _it-legacy_ webhook for collecting `incidents` |
| |
| For it-new `project`: |
| - add 1 scope to GitHub for `repos` _it-new-1_, _it-new-2_, _it-core-1_ and _it-core-2_ to collect their `pull requests` |
| - add 1 scope to Jenkins for `deployments` of _it-new-1_, _it-new-2_, _it-core-1_ and _it-core-2_ `repos` |
| - include the _it-new_ webhook for collecting `incidents` |
| |
| #### 4.2.4. Resulting Metrics |
| See [4.1.5 Resulting Metrics](HowToOrganizeDevlakeProjects.md#415-resulting-metrics) |
| |
| ## 5. About Webhooks |
| **Assigning a UNIQUE webhook to each project is critical.** This ensures that the DevLake platform |
| correctly associates the incoming data with the corresponding project through the webhook. |
| |
| If you use the same webhook across multiple projects, the data sent by it **will be replicated per each |
| project that uses that webhook**. More information available on the [Webhook](/docs/Plugins/webhook.md) page |
| |
| ## 6. Troubleshooting |
| |
| If you run into any problem, please check the [Troubleshooting](/docs/Troubleshooting/Configuration.md) or [create an issue](https://github.com/apache/incubator-devlake/issues) |